首页> 外文会议>2007采矿科学与安全技术国际学术会议 >Analysis of the Stability of 3-D Slope Engineering in the Transition from Surface Mining to Underground Mining
【24h】

Analysis of the Stability of 3-D Slope Engineering in the Transition from Surface Mining to Underground Mining

机译:从地面采矿到地下采矿过渡的3D边坡工程稳定性分析

获取原文

摘要

After building the 3-D engineering geological model and the 3-D calculating model of the North-West edge slope engineering (NWESE) in An Tai Bao surface mine, by using FLAC3D technique, the stability of the 3-D slope engineering was analysed and evaluated, which was under such conditions before, during and after mining, and the key technical problems whether it was possibility to mine were successfully solved. The engineering practice had benefited more in technic and economic from the theoretical results. It shows the conclusion to the similar field conditions, which is of important theoretical meaning to direct the practice in the similar engineering.
机译:在安大堡露天矿建立西北边坡工程的3-D工程地质模型和西北边坡工程的3-D计算模型后,利用FLAC3D技术,对3-D边坡工程的稳定性进行了分析。并评估了在开采前,开采中和开采后处于这种条件下的情况,并成功解决了是否有可能开采的关键技术问题。理论成果使工程实践在技术和经济上受益匪浅。它表明了相似领域条件的结论,这对指导相似工程实践具有重要的理论意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号