Consolidate Earned Value Principle with Integrated Cost Management- On Project Budget Control during Construction and Investment Period

机译:整合综合成本管理,整合盈余价值原则-建设和投资期项目预算控制

获取原文

摘要

Considering solitary and hysteretic nature which exist in current change control, an idea of dynamic change control about integrated cost management change control technology about construction period and investment is proposed to sove the two problems. The idea regards management method of earned value as research object to seek binding model of construction period and investment.In the end, an example is given to discuss the main content and fundamental procedure of change control about construction period and investment integrated cost management.
机译:考虑到当前变更控制中存在的孤立性和滞后性,提出了一种综合成本管理变更控制技术,涉及工期和投资的动态变更控制思想,以解决这两个问题。该思想以挣值的管理方法为研究对象,寻求建设期与投资的约束模型。最后,以算例探讨了建设期与投资综合成本管理的变更控制的主要内容和基本过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号