首页> 外文会议>Canadian Society for Civil Engineering annual conference >AN INTELLIGENT CREW ALLOCATION SYSTEM FOR THE PRECAST MANUFACTURING SYSTEMS: RAILWAY SLEEPERS PRECAST CONCRETE AS A CASE STUDY
【24h】

AN INTELLIGENT CREW ALLOCATION SYSTEM FOR THE PRECAST MANUFACTURING SYSTEMS: RAILWAY SLEEPERS PRECAST CONCRETE AS A CASE STUDY

机译:预制制造系统的智能船员分配系统:以铁路睡船预制混凝土为例

获取原文

摘要

This paper presents an innovative approach for best allocation of crews of workers onproduction processes by combining flow-chart based simulation tool with a powerful genetic optimizationprocedure. The proposed approach determines the least costly and most productive crew allocation on aset of production processes. IDEF0 diagrams were developed to provide generic and functional diagramsfor each process. Discrete Event Simulation Methodology is used to develop the precast-componentmanufacturing simulation model. A proposed GA model is developed to be integrated with the developedsimulation model. This type of integration will add more intelligence to the simulation model for a bettersearch. GA operators were developed to suit this type of problems. A precast concrete manufacturingsystem producing sleepers was chosen as a test bed for the proposed SIM_Crew allocation system.SIM_Crew system is easy to use and can be utilised for large scale manufacturing systems. Based onthis research, computer simulation and genetic algorithms can be an effective combination and offer agreat potential for improving productivity and saving production time and cost. The results showed thatadopting different combinations of possible crews of workers had a substantial impact on reducing thetotal labour cost, process idle time and in maximising the utilisation of skilled workers.
机译:本文提出了一种创新方法,以便获得工人工作人员的最佳方法 通过强大的遗传优化结合基于流程图的仿真工具来生产过程 程序。拟议的方法确定了最便宜的昂贵和最富有成效的船员分配 一套生产过程。开发了IDEF0图以提供通用和功能图 对于每个过程。离散事件仿真方法用于开发预制组件 制造仿真模型。开发了一个建议的GA型号与发达国家集成 模拟模型。这种类型的集成将增加仿真模型的更多智能化 搜索。制定了GA运营商以适应这种问题。预制混凝土制造 系统生产睡眠机被选择为所提出的SIM_CREW分配系统的测试床。 SIM_CREW系统易于使用,可用于大型制造系统。基于 这项研究,计算机仿真和遗传算法可以是有效的组合和提供 提高生产力和节省生产时间和成本的巨大潜力。结果表明 采用不同的工人船员的不同组合对减少的影响很大 劳动力成本总,过程闲置时间和最大限度地利用技术人员的利用率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号