首页> 外文会议>IEEE Power and Energy Society General Meeting >A new framework to facilitate the use of node-breaker operations model for validation of planning dynamic models in WECC
【24h】

A new framework to facilitate the use of node-breaker operations model for validation of planning dynamic models in WECC

机译:一种新的框架,便于使用节点断路器操作模型来验证WECC中的规划动态模型

获取原文

摘要

Power Systems Operations and Planning departments historically use different models. Online operations models are based upon node-breaker representation of the system whereas offline planning models are based on bus-branch representation of the same system. Use of different models to represent the same power system leads to discrepancies in data and makes it difficult and inefficient to validate the dynamic models used in short and long term planning for different operating conditions. This paper summarizes a new framework developed by WECC, Peak Reliability and General Electric to facilitate the use of the node-breaker operations model for validation of planning dynamic models used in the western interconnection of United States using GE PSLF.
机译:电力系统运营和规划部门在历史上使用不同的型号。在线操作模型基于系统的节点断路器表示,而离线规划模型基于同一系统的总线分支表示。使用不同的模型来表示相同的电力系统导致数据中的差异,并且验证短期和长期规划中使用的动态模型难以且低效地验证不同的操作条件。本文总结了WECC,峰值可靠性和通用电气开发的新框架,便于使用节点断路器操作模型,以便使用GE PSLF对美国西部互连的规划动态模型进行验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号