首页> 外文会议>IFIP WG 5.7 international conference on advances in production management systems >Integrated Assembly Line Balancing with Skilled and Unskilled Workers
【24h】

Integrated Assembly Line Balancing with Skilled and Unskilled Workers

机译:熟练工人与非熟练工人的综合流水线平衡

获取原文

摘要

In this paper, we extend the general assembly line balancing problem by designing an integrated assembly line and addressing the number of workstations and simultaneous assignments of skilled and unskilled workers. We develop a mixed integer program that minimizes the sum of total annual workstation costs and annual salaries of skilled and unskilled workers within a predetermined cycle time. Because this problem is NP-hard, we also develop a genetic algorithm to obtain efficient solutions for large problems. Numerical experiments demonstrate the efficiency of the random key-encoded genetic algorithm.
机译:在本文中,我们通过设计一条集成的装配线并解决工作站的数量以及熟练工人和非熟练工人的同时分配问题,扩展了一般装配线的平衡问题。我们开发了一个混合整数程序,该程序在预定的周期时间内将总的年度工作站成本和熟练与不熟练工人的年薪之和最小化。因为此问题是NP难题,所以我们还开发了一种遗传算法来获得针对大问题的有效解决方案。数值实验证明了随机密钥编码遗传算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号