首页> 外文会议>IEEE International Meeting on Power, Electronics and Computing >Methodology to evaluate the repowering of small hydroelectric power plants: Case study El Amarillo in Portovelo, Ecuador
【24h】

Methodology to evaluate the repowering of small hydroelectric power plants: Case study El Amarillo in Portovelo, Ecuador

机译:评估小水力发电厂重新交能的方法:厄瓜多尔·厄瓜多尔·厄瓜多尔的案例研究El Amarillo

获取原文

摘要

In this paper, a methodology to evaluate the repowering of small hydroelectric power plants is proposed. This methodology considers the technical and economic viability of the project. The methodology includes an analysis of the current state of elements of the power plant, such as electromechanical equipment and existing infrastructure. The technical analysis includes the hydrological study, which allows determining the appropriate equipment based on the water flow. On the other hand, financial analysis provides a valuable tool to determine the viability of repowering. The case study is El Amarillo power plant in Portovelo, Ecuador, it is a small hydroelectric power plant, currently abandoned. The modernization of the power plant based on current technology allows the electricity generation from renewable resources, contributing to local development and the reduction of CO2 emissions with an installed power of approximately 3.3MW.
机译:本文提出了一种评价小型水电站重新交能的方法。该方法考虑了该项目的技术和经济可行性。该方法包括对电厂元件的当前状态的分析,例如机电设备和现有基础设施。技术分析包括水文研究,允许基于水流确定适当的设备。另一方面,财务分析提供了一种有价值的工具来确定重新交锋的可行性。案例研究是厄瓜多尔·厄瓜多尔·厄瓜多洛的El Amarillo发电厂,它是一个小型水力发电设备,目前被遗弃。基于当前技术的电厂现代化允许从可再生资源产生的发电,促进局部开发和减少二氧化碳排放量约为3.3mW。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号