Contribution of schedule delays to cost growth: How to make peace with a marching army

机译:进度延误对成本增长的贡献:如何与行军实现和平

获取原文

摘要

Numerous research papers have shown that cost and schedule growth are interrelated for NASA space science missions. Although there has shown to be a strong correlation of cost growth with schedule growth, it is unclear what percentage of cost growth is caused by schedule growth and how schedule growth can be controlled. This paper attempts to quantify this percentage by looking at historical data and show detailed examples of how schedule growth influences cost growth. The paper also addresses a methodology to show an alternate approach for assessing and setting a robust baseline schedule and use schedule performance metrics to help assess if the project is performing to plan. Finally, recommendations are presented to help control schedule growth in order to minimize cost growth for NASA space science missions.
机译:大量研究论文表明,成本和进度的增长与NASA太空科学任务息息相关。尽管已显示成本增长与进度增长之间存在很强的相关性,但尚不清楚进度增长导致成本增长的百分比以及如何控制进度增长。本文尝试通过查看历史数据来量化此百分比,并显示时间表增长如何影响成本增长的详细示例。本文还讨论了一种方法,该方法显示了一种替代方法,用于评估和设置健壮的基准计划,并使用计划绩效指标来帮助评估项目是否按计划进行。最后,提出了一些建议,以帮助控制进度计划的增长,以最大程度地降低NASA太空科学任务的成本增长。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号