Impediments in Using Design-Build or Construction Management-at-Risk Delivery Methods for Water and Wastewater Projects

机译:在水和废水项目中使用设计,建造或施工风险管理交付方法的障碍

获取原文

摘要

The use of alternative project delivery methods, such as design-build (DB) and construction manager-at-risk (CMAR) in the design and construction of water and wastewater projects has been hindered by several impediments existing for owner organizations. This study identified these impediments as well as possible solutions when using these delivery methods. A questionnaire was designed and sent to utility managers and wastewater owners of the Water Environment Federation and the American Water Works Association, and 104 responses were received. The results showed that the majority of respondents-representing 32 states in North America-faced such internal impediments as "unfamiliarity with the process" and "resistance to change within management or policy officials" when these delivery methods were used. In addition, most respondents faced external impediments, such as "state procurement statutory requirements" and "municipal or agency procurement regulations." Recommendations based on this study include educating and training the decision makers (policy officials, project staff, and procurement and legal staff) regarding these delivery methods and changing the state procurement rules.
机译:业主组织存在的一些障碍阻碍了在水和废水项目的设计和施工中使用替代项目交付方法,如设计建造(DB)和风险施工经理(CMAR)。这项研究确定了使用这些交付方式时的这些障碍以及可能的解决方案。设计了一份调查表,并将其发送给了水环境联合会和美国水务协会的公用事业经理和废水所有者,共收到104份答复。结果表明,使用这些交付方式时,代表北美32个州的大多数受访者面临着内部障碍,如“不熟悉流程”和“对管理层或政策官员内部的变革持反对态度”。此外,大多数受访者都面临外部障碍,例如“国家采购法规要求”和“市政或机构采购法规”。基于此研究的建议包括对决策者(政策官员,项目人员以及采购和法律人员)进行教育和培训,以了解这些交付方式以及更改州采购规则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号