Design of a New Dam on the Kentucky River Spotlighting the Renovation of Kentucky River Lock and Dam No. 10 Project

机译:肯塔基河上的新水坝设计聚焦肯塔基河闸和十号水坝的整修

获取原文

摘要

The Kentucky River system consists of 14 lock and dam structures built from 1836 to 1917 along the 255-mile river. It is estimated that almost a fourth of Kentucky's population relies on the river for water supply. The dam structures are run-of-the-river. meaning that they overtop constantly (except in extreme drought conditions). Most of the locks are closed to river traffic, but a few remain open for recreational use. Lock and Dam No. 10 is one of the highest priority facilities in the river system. It impounds the water supply for the city of Winchester, and the pool downstream of the dam provides water for the city of Lexington (the second largest city in the state). The original Lock and Dam No. 10 on the Kentucky River (circa 1904) was constructed of first generation concrete, stone masonry, and rock-filled timber cribbing. The structures are over 110 years old, in a state of deterioration, and do not meet current stability criteria. Design is nearing completion for a replacement dam (just upstream of the existing facility), and a renovated lock that would revamp recreational river traffic in the area. Several important design considerations were accounted for at the site, including a municipal raw water intake just upstream of the dam. a recreational beach just downstream of the dam, and a well-known state park adjoining one of the dam abutments. To minimize the upstream and downstream impacts of the new dam and maintain the existing hydraulic signature of the river, extensive river flow modeling was performed to compare existing and proposed conditions.
机译:肯塔基河水系统由14个船闸和水坝结构组成,建于1836年至1917年,沿255英里河。据估计,肯塔基州将近四分之一的人口依靠河来供水。大坝的结构是过河的。表示它们不断超车(极端干旱条件下除外)。大部分船闸对河道通行不开放,但仍有一些闸门可供休闲使用。洛克10号大坝是河流系统中最重要的设施之一。它为温彻斯特市蓄水,大坝下游的水池为列克星敦市(该州第二大城市)提供水。肯塔基河(大约在1904年)上的最初的洛克10号和大坝是由第一代混凝土,砌石和岩石堆砌而成的。这些结构已有110多年的历史,处于退化状态,不符合当前的稳定性标准。替换大坝(就在现有设施的上游)和翻修过的船闸的设计已接近完成,这将改善该地区的休闲河道。在现场考虑了几个重要的设计考虑因素,包括大坝上游的市政原水取水口。大坝下游的休闲海滩,以及与大坝桥墩之一相邻的著名国家公园。为了最大程度地减少新坝的上游和下游影响并保持河流的现有水力特征,进行了广泛的河流流量模拟以比较现有条件和拟议条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号