首页> 外文会议>AREMA annual conference >BEST PRACTICES FOR MAPPING RAIL ASSETS IN HIGHLY URBANIZED ENVIRONMENTS. A CASE STUDY FROM THE BART NETWORK
【24h】

BEST PRACTICES FOR MAPPING RAIL ASSETS IN HIGHLY URBANIZED ENVIRONMENTS. A CASE STUDY FROM THE BART NETWORK

机译:在高度城市化的环境中映射铁路资产的最佳做法。来自BART网络的案例研究

获取原文

摘要

Globally, rail owners and maintainers are benefiting from efficient mobile multi-sensor survey systems that deliver purposeful engineering survey data of rail tracks and corridors. In 2015, the Bay Area Rapid Transit (BART) embarked on a ground breaking project to map assets across its entire network. The BART network presents significant challenges in mapping assets due to extensive underground sections where no GPS information is available and where there is only limited lighting. The approach taken required the use of multi-sensor surveying systems to create a contiguous three dimensional dataset of the BART network covering both surface and underground sections. The 360 degree imagery and LiDAR datasets of the BART network were recorded at normal travel speeds so that impacts on operations were minimized. Special workflows were then used to extract asset information across the network in the detail required for BART's enterprise Geographic Information System (eGIS) and asset management systems. This paper will describe the project undertaken by Geomatic Technologies, BART and LTK Engineering, discussing the methodologies and technologies used to address BART's network requirements, best practices for data collection, data processing and data management, project risks and mitigations, as well as lessons learnt. The paper will also discuss how these high value datasets have been integrated with existing corporate systems to promote sharing across the business and to support BART's day to day engineering and operational activities.
机译:在全球范围内,铁路所有者和维护者都将从高效的移动多传感器测量系统中受益,该系统可提供有针对性的铁路轨道和走廊工程测量数据。 2015年,湾区捷运公司(BART)开展了一项开创性的项目,以绘制整个网络中的资产地图。由于地下区域广泛,无法获得GPS信息,且照明仅有限,因此BART网络在绘制资产地图时面临着巨大的挑战。采取的方法需要使用多传感器测量系统来创建覆盖地表和地下部分的BART网络的连续三维数据集。 BART网络的360度图像和LiDAR数据集以正常的行进速度记录下来,从而将对操作的影响降到最低。然后,使用特殊的工作流在整个网络上提取BART企业地理信息系统(eGIS)和资产管理系统所需的详细信息。本文将描述Geomatic Technologies,BART和LTK Engineering承担的项目,并讨论用于解决BART网络要求的方法和技术,数据收集,数据处理和数据管理的最佳实践,项目风险和缓解措施以及汲取的经验教训。本文还将讨论如何将这些高价值数据集与现有公司系统集成在一起,以促进整个企业之间的共享并支持BART的日常工程和运营活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号