The Habanero (or Cooper Basin) Enhanced Geothermal System (EGS) project commenced in 2000. Over 15+ years of operations, six deep EGS wells were drilled into deep, hot granite near the town of Innamincka in Central Australia. Multiple hydraulic stimulations and well tests were performed and two extended closed loop circulation tests were conducted. A binary power plant was even installed on site to demonstrate the ability of an EGS system to generate electricity. However, despite the technical success of the project, it failed to satisfy key economic measures and the entire project is now in the process of being abandoned. Over those years of active planning, drilling, stimulation, testing and evaluation, numerous papers have been published to describe and discuss various aspects or phases of the project. This paper will attempt to collate the key reservoir lessons from the Habanero experience and relate them to other EGS projects in general.
机译:哈瓦那人(或库珀盆地)增强地热系统(EGS)项目于2000年开始。经过15多年的运营,在澳大利亚中部Innamincka镇附近的深热花岗岩中钻了6口深EGS井。进行了多次液压增​​产和试井,并进行了两次扩展的闭环循环测试。甚至在现场安装了一个二进制电厂,以演示EGS系统发电的能力。但是,尽管该项目在技术上取得了成功,但仍不能满足关键的经济措施,整个项目现在正在被放弃。在积极的计划,钻探,增产,测试和评估的那些年里,已经发表了许多论文来描述和讨论该项目的各个方面或阶段。本文将尝试整理从哈瓦那罗(Habanero)经验中获得的关键水库课程,并将它们与总体上其他EGS项目联系起来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号