Using Analytical Network Process to Analyze Construction Method Selection in Highway Projects

机译:利用分析网络过程分析公路工程施工方法选择

获取原文

摘要

Construction projects are complex in nature because they typically include more than one, sometimes conflicting, objectives such as time and cost. Sustainable construction requires that environmental impact also be included as a new project objective. With multiple objectives, a contractor needs to know all available alternatives of resources, as well as different project factors affecting the outcome of a project. It is thus important to have a mechanism to consider both the properties of various resource alternatives and the severity of project conditions as the decision of contractors are affected by these parameters. Considering the complexity of the construction projects, the mechanism should be capable of analyzing the dependence between resource properties and project conditions in order to select the most feasible construction method. Analytic network process (ANP) is a powerful tool to structure such a decision problem and handle interactions among construction parameters. The ANP decision model developed in this study used expert opinion from highway construction professionals to reflect the dependency between decision parameters. The initial findings of the study are used to explore the relative importance of a group of project conditions and construction method indicators on the selection of construction methods under time, cost and environmental impact (TCEI) constraints. The progress of the study provides a base for examining the decision-making parameters in highway construction projects when the contractor’s ability to select construction methods is limited by various project constraints.
机译:建设项目本质上是复杂的,因为它们通常包含多个目标,有时是相互矛盾的,例如时间和成本。可持续建设要求将环境影响也纳入新的项目目标。具有多个目标,承包商需要了解所有可用的资源替代方案,以及影响项目成果的不同项目因素。因此,重要的是要有一种机制来考虑各种资源替代方案的属性和项目条件的严重性,因为承包商的决定受这些参数的影响。考虑到建设项目的复杂性,该机制应能够分析资源属性与项目条件之间的依赖关系,以便选择最可行的建设方法。分析网络过程(ANP)是构建此类决策问题并处理构造参数之间相互作用的强大工具。本研究中开发的ANP决策模型使用了公路建设专业人士的专家意见来反映决策参数之间的依赖性。该研究的初步发现用于探索一组项目条件和施工方法指标在时间,成本和环境影响(TCEI)约束下选择施工方法的相对重要性。当承包商的选择施工方法的能力受到各种项目约束的限制时,研究的进展为检查公路建设项目的决策参数提供了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号