首页> 外文会议>POWER-GEN Asia Conference >Five years of successful operation of Paka and Pasir Gudang CCGT
【24h】

Five years of successful operation of Paka and Pasir Gudang CCGT

机译:五年的Paka和Pasir Gudang CCGT成功运作

获取原文

摘要

This paper deals with the first five years of an Operation and Maintenance (O&M) company serving two of the most successful gas-fired combined cycle power station projects in recent years: YTL's Power Stations at Paka (808 MW) and Pasir Gudang (404 MW), located in Malaysia.
机译:本文介绍了近年来的运营和维护的前五年(O&M)公司近年来,近年来的两个最成功的燃气组合循环电站项目:YTL在Paka(808 MW)和Pasir Gudang的发电站(404 MW ),位于马来西亚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号