首页> 外文会议>International Vacuum Web Coating Conference >REDUCING CHANGEOVER TIME ON A COATING LINE
【24h】

REDUCING CHANGEOVER TIME ON A COATING LINE

机译:在涂布线上减少转换时间

获取原文

摘要

As the pressures to make production schedules rise, coating firms look for ways to increase productivity. Obvious answers are speeding up the machine, using overtime or additional shifts or new equipment. Another alternative is to look at the wasted time between coating runs. Many coating lines run more than one product. To switch from one product to another may require more changes than just the web speed, tension and oven temperatures. Other changes might include web width or caliper, web materials, fluids and delivery equipment (pumps, lines and filters), coating head, cleaning idler rolls and associated area cleanups. This paper will cover the steps to consider in establishing a reduction in the changeover time. We will look at planning, data collection, analysis and what to do with this information.
机译:随着生产计划提高的压力,涂层公司寻找提高生产力的方法。明显的答案正在加速机器,使用加班或额外的换档或新设备。另一种选择是看涂层之间的浪费时间。许多涂层线运行多于一个产品。要从一个产品切换到另一个产品可能需要比幅材速度,张力和烤箱温度更多的变化。其他变化可能包括网宽或卡尺,网页,流体和送货设备(泵,线条和过滤器),涂层头,清洁惰轮辊和相关区域清理。本文将涵盖在规范转换时间的减少时考虑的步骤。我们将查看规划,数据收集,分析以及如何处理此信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号