首页> 外文会议>Space congress >Operations and Maintenance Requirement Specification Automated Buy Off System (OMRS-ABOS)
【24h】

Operations and Maintenance Requirement Specification Automated Buy Off System (OMRS-ABOS)

机译:操作和维护要求规范自动购买OFF系统(OMRS-ABOS)

获取原文

摘要

Project Engineering is the Kennedy Space Center (KSC) organization responsible for monitoring the progress of milestone-closure as part of Space Shuttle processing, also known as a flow. An Operations Maintenance Plan (OMP) is a plan used to process a Space Shuttle as it is in a flow for a single mission. Each requirement-line-item in an OMP is known as an Operations and Maintenance Requirement Specification (OMRS). Each OMRS must be verified and closed separately by a configuration management person and an engineer. An Operations and Maintenance Instructions (OMI) document, which is a type of Work Authorization Document (WAD), consists of sequences of steps of tasks performed on a Space Shuttle used to satisfy a set of OMRS's. Performing steps in an OMI is a prerequisite for an OMRS to be verified and closed. Project Engineering monitors verification-closure status, i.e. open or accomplished, of OMRSs with software known as Operations and Maintenance Requirement Specification Flow Planning (OMRSFP). The manual verification-closure of an OMRS in OMRSFP is known as buy-off.
机译:项目工程是肯尼迪航天中心(KSC)组织负责监测里程碑封闭的进度作为航天飞机处理的一部分,也称为流量。运营维护计划(OMP)是用于处理空间班车的计划,因为它流以为单一任务的流程。 OMP中的每个要求线项称为操作和维护要求规范(OMR)。每个OMR必须由配置管理人员和工程师单独验证和关闭。作为一种工作授权文档(WAD)的操作和维护说明(OMI)文档包括在用于满足一组OMRS的航天飞机上执行的任务步骤序列。在OMI中执行步骤是要验证和关闭的OMR的先决条件。项目工程监控验证 - 关闭状态,即OMRS,具有称为操作和维护要求规范流量规划(OMRSFP)的软件。 OMRSFP中OMRS的手动验证闭合被称为买断。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号