首页> 外文会议>Thirty-Ninth Space Congress, Apr 30-May 3, 2002, Cape Canaveral, Florida >Operations and Maintenance Requirement Specification Automated Buy Off System (OMRS-ABOS)
【24h】

Operations and Maintenance Requirement Specification Automated Buy Off System (OMRS-ABOS)

机译:操作和维护要求规范自动购买系统(OMRS-ABOS)

获取原文
获取原文并翻译 | 示例

摘要

Project Engineering is the Kennedy Space Center (KSC) organization responsible for monitoring the progress of milestone-closure as part of Space Shuttle processing, also known as a flow. An Operations Maintenance Plan (OMP) is a plan used to process a Space Shuttle as it is in a flow for a single mission. Each requirement-line-item in an OMP is known as an Operations and Maintenance Requirement Specification (OMRS). Each OMRS must be verified and closed separately by a configuration management person and an engineer. An Operations and Maintenance Instructions (OMI) document, which is a type of Work Authorization Document (WAD), consists of sequences of steps of tasks performed on a Space Shuttle used to satisfy a set of OMRS's. Performing steps in an OMI is a prerequisite for an OMRS to be verified and closed. Project Engineering monitors verification-closure status, i.e. open or accomplished, of OMRSs with software known as Operations and Maintenance Requirement Specification Flow Planning (OMRSFP). The manual verification-closure of an OMRS in OMRSFP is known as buy-off.
机译:项目工程是肯尼迪航天中心(KSC)的组织,负责监视里程碑关闭的进度,这是航天飞机处理(也称为流程)的一部分。运营维护计划(OMP)是用于处理航天飞机的计划,因为该航天飞机正在进行单个任务。 OMP中的每个需求行项目都称为操作和维护需求规范(OMRS)。每个OMRS必须由配置管理人员和工程师分别验证和关闭。操作和维护指令(OMI)文档是一种工作授权文档(WAD),由在用于满足一组OMRS的航天飞机上执行的任务的步骤序列组成。在OMI中执行步骤是验证和关闭OMRS的先决条件。项目工程部使用称为操作和维护要求规范流程计划(OMRSFP)的软件监视OMRS的验证关闭状态,即打开或完成。在OMRSFP中手动关闭OMRS的验证被称为买断。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号