首页> 外文会议>International Yellow River Forum on River Basin Management >Research on Crossing Yellow River Works for the Middle Route of South - to - North Water Transfer Project
【24h】

Research on Crossing Yellow River Works for the Middle Route of South - to - North Water Transfer Project

机译:南 - 北方水转算项目中线交叉黄河工程研究

获取原文

摘要

This article introduces basic conditions and main technical indices used for the planning and design of the Crossing Yellow River Works for the Middle Route of South - to -North Water Transfer Project, and demonstrates the relevant important issues. The technical characteristics and basic requirements for both aqueduct and tunnel alternatives are described in respect of technical feasibility.
机译:本文介绍了基本条件和主要技术指标,用于南北 - 北方水转算项目中途路线的交叉黄河工程的规划和设计,并展示了相关的重要问题。关于技术可行性描述了渡槽和隧道替代品的技术特性和基本要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号