首页> 外文会议>Annual North American Waste to Energy Conference >Design, Construction, Start-up and Commissioning of a State-of-the-Art Water-Cooled Grate WtE-Plant for Oerebro, Sweden
【24h】

Design, Construction, Start-up and Commissioning of a State-of-the-Art Water-Cooled Grate WtE-Plant for Oerebro, Sweden

机译:瑞典奥雷布罗的最先进的水冷炉WTE工厂的设计,施工,启动和调试

获取原文

摘要

In 2001, SEGHERS was awarded the contract for the design and construction of the furnace and heat recovery system of a new, 330 tons per day WtE-plant in Orebroe, Sweden. A wide variety of municipal and industrial wastes (including electronic waste, demolition waste, car fluff, filters, plastic and rubber...) will be treated. The design point corresponds to an average heating value (HHV) of 13.1 MJ/kg (5600 Btu/Lb). The first part of the paper addresses the engineering and construction phase of the project, which took 15 months in total. Key decisions and design options, including the choice and characteristics of a partially water-cooled grate, the use of the cooling water heat (with implications on plant efficiency) and the design features resulting in a low-NOx WtE plant are discussed in detail. The second part of the paper focuses on the construction and commissioning of the plant. Finally, the plant performance is documented. The main results are compared with the guaranteed values and the differences are discussed. The performance of the water-cooled grate is compared to that of other WtE plants.
机译:2001年,Seghers被授予瑞典厄尔伯因州每天330吨的炉子和热回收系统的设计和建造合同。将处理各种各样的市政和工业废物(包括电子废物,拆除废物,汽车绒毛,过滤器,塑料和橡胶......)。设计点对应于13.1MJ / kg(5600 BTU / LB)的平均加热值(HHV)。本文的第一部分涉及项目的工程和施工阶段,总共花了15个月。关键决策和设计选项,包括部分水冷篦的选择和特性,使用冷却水的使用(具有植物效率的影响)和导致低NOX WTE工厂的设计特征。本文的第二部分侧重于植物的建设和调试。最后,记录了工厂性能。主要结果与保证值进行比较,讨论差异。将水冷篦的性能与其他WTE植物的性能进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号