首页> 外文会议>International Symposium on Mine Planning and Equipment Selection >Case studies of quality assessment in lateral development of hard rock mines
【24h】

Case studies of quality assessment in lateral development of hard rock mines

机译:硬岩地雷横向发展质量评估案例研究

获取原文

摘要

Quality assurance of the particular components of the development cycle becomes instrumental in achieving high rate of advance in a lateral development process. The development practices at hard rock mines of Falconbridge Ltd. and Boliden AB, in Canada and Sweden respectively, are captured and simulated using discrete event simulation. The practices are analyzed to identify quality issues, as they relate to cost, speed, and overall performance. The process performance in each activity is evaluated using indices, while Pareto analysis is applied for prioritization of components causing process delays. It is found that, overall, the Boliden practice has better quality performance than the Falconbridge practice.
机译:开发周期特定组成部分的质量保证在横向开发过程中实现了高进步率的工具。分别使用离散事件仿真捕获并模拟CALConbridge Ltd.和Boliden AB的硬岩矿的开发实践。分析了实践以识别质量问题,因为它们与成本,速度和整体表现相关。使用索引评估每个活动中的过程性能,而Pareto分析应用于导致过程延迟的组件的优先级。结果发现,总体而言,Boliden实践具有比Falconbridge实践更好的质量表现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号