The application of real-time monitoring techniques in effect assessment of the controlling engineering on the Lianziya hazardous rock body

机译:实时监测技术在莲子危险岩体控制工程效果评价中的应用

获取原文

摘要

Using the surface displacement and rock body stress techniques, the stability conditions of Lianziya Hazardous Rock Body before and after the controlling engineering being executed are compared and analyzed, thereby the stabilization effect of controlling engineering is assessed. And It had formed a multi-means tridimensional monitoring system with data collected and disposed automatically since the monitoring system on Lianziya hazardous rock body was worked up. The real-time monitoring had lasted for more than 6 years until the end of 2005. The Controlling Engineering On Lianziya Hazardous Rock Body, located in the Three Gorges of the Yangtse River, commenced in May 1995. Then the Wuwanfang anchor cable completed in August 1997 and load bearing anti-slide body had accomplished in August 1998. The whole project took a period of more than 4 years. The degree of security of Rock body was rather increased after the engineering construction, horizontal deformation velocity changed from 1.04-2.48 mm/a (millimeters per year) to 0.76-2.42 mm/a and vertical deformation velocity transformed from 0.4-1.0 to 0.2-1.12 mm/a in the monitoring spots set on earth's surface and underground, and it is confirmed that the rock body had gradually came stable. Meanwhile, the variety of the deformation velocity in area coverage during the process of construction shows that the hazardous rock body is sensitive to disturbance of the construction. It is indicated that the monitoring system set up in project is effective.
机译:使用表面位移和岩体应力技术,比较和分析控制工程之前和之后的莲子危险岩体的稳定性条件,从而评估控制工程的稳定效果。它已经形成了一种多均趋势监测系统,自动收集和自动处理的数据,因为莲子危险岩体的监测系统已经锻炼。 2005年底,实时监测持续了6年以上。在1995年5月开始,位于长江河三峡的莲子危险岩体控制工程。然后是武湾锚索在八月完成1997年8月1998年8月的载荷抗滑动机构。整个项目花了4年多。工程结构后岩体的安全程度相当增加,水平变形速度从1.04-2.48毫米/ a(每年毫米)变为0.76-2.42 mm / a,垂直变形速度从0.4-1.0转换为0.2-在地球表面和地下设定的监测点中1.12毫米/例,确认岩体逐渐稳定。同时,施工过程中面积覆盖范围内的变形速度的各种表明,危险岩体对建筑的扰动敏感。结果表明,项目中设置的监控系统是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号