首页> 外文会议>International Congress on the Science and Technology of Ironmaking >THE START-UP AND SUBSEQUENT OPERATION OF MITTAL STEEL IH7 BF THIRD CAMPAIGN
【24h】

THE START-UP AND SUBSEQUENT OPERATION OF MITTAL STEEL IH7 BF THIRD CAMPAIGN

机译:Mittal Steel IH7 BF第三次活动的启动和随后的操作

获取原文

摘要

Indiana Harbor #7 (IH7) Blast Furnace of Mittal Steel USA, successfully underwent a major reline in 2003 and it was blown-in in the beginning of October 4, 2003. Major changes affecting the internal operation of the furnace were the installation of staves and a longer bell-less top chute. A significant change was also made in the design of the furnace hearth incorporating a deeper sump, a thinner bottom and a block concept. In this paper, the blow-in performance, the studies to understand the changes in burden distribution and the developed practical modifications to burden distribution are presented and discussed. The performance of the hearth and the development of the stabilized burn lines are also discussed.
机译:印第安纳港口#7(IH7)米特钢铁美国的高炉炉,2003年成功完成了一个主要的Reline,它在2003年10月4日开始被吹入其中。影响炉子内部运作的重大变化是安装汽笛的安装还有更长的别的顶级滑槽。还可以在炉炉的设计中进行显着变化,其中包含更深的油底壳,较薄的底部和块概念。本文介绍了吹口性能,研究了解负担分布的变化和对负担分布的制定的实际修改。还讨论了炉膛的性能和稳定的烧伤线的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号