TWISTS AND TURNS OF ICHTHYS PROJECT - THE ROAD TO FID AND BEYOND: INPEX as the First Japanese Operator of a World-Class LNG Project getting over TECOP Challenges

机译:ICHTHYS项目的曲折和转弯 - FID及以外的道路:INPEX作为世界级LNG项目的第一个越过TECOP挑战的日本经营者

获取原文

摘要

On 13 January 2012, INPEX made the Final Investment Decision to develop the Ichthys Gas and Condensate Field, which targets the first production by the end of 2016, having overcome a number of Technical, Economical, Commercial, Organizational and Political challenges. Upon the award of the exploration permit for the WA-285-P acreage off Western Australia in 1998, INPEX faced the first challenge to find exploration partners. Having failed that, INPEX had to complete the exploration works at its own risk, but it was rewarded by the excellent discovery of the condensate-rich gas field in 2000, and that was followed by successful drilling of a series of appraisal wells to delineate the vast accumulation of hydrocarbons. After the extensive studies, INPEX had matured the development concept to locate the LNG facilities on the Maret Islands off the Kimberley Coast, and commenced environmental approval processes in 2006. Facing a lack of political supports over the environmentally untouched Maret Islands which was also regarded as one of holy places by the indigenous people, however, INPEX started to investigate alternative concepts and locations for the development, and in September 2008, INPEX chose Darwin as the plant site. This brought us another boost of technical challenges including an 900km subsea pipeline from the Ichthys Field to Darwin, one of the largest scale of the floating production facilities and so on, as well as a number of social and political issues. Furthermore INPEX has managed all these challenges with ever-rising costs and a closing LNG marketing window firmly in mind. With the mission to share Japanese values with the world, INPEX was fortunate to attract many talented people all across Australia and worldwide to establish Perth as the centre of gravity for the Ichthys Project. Based upon mutual trust and benefits among all stakeholders, INPEX is now fully geared to deliver a safe and reliable project within budget and on time thereby ensuring stable supply of LNG to buyers in a carbon constrained future for decades to come.This paper outlines the paths of progress of the Ichthys Project. What is presented here is based on the statuses of the project as of December 2012.
机译:13 2012年1月,INPEX作出最终投资决定开发Ichthys项目天然气和凝析气田,它的目标由2016年底第一条生产,在克服了许多技术,经济,商业,组织和政治挑战。在为1998年的WA-285-P面积过西澳的勘探许可证的奖项,INPEX面临的第一个挑战,寻找合作伙伴的探索。混不下去的是,INPEX必须完成在其自身的风险勘探工作,但它是由富含凝析气田在2000年的优异发现回报,这是随后进行了一系列评价井划定的成功钻探碳氢化合物的广阔积累。人在深入研究后,INPEX已经成熟的发展理念定位在Maret群岛关金伯利海岸的液化天然气设施,并开始进行环境审批流程在2006年面临缺乏政治支持的在环境不变Maret群岛这同样被认为是由原住民圣地之一,不过,INPEX开始研究替代概念和地区的发展,并于2008年9月,INPEX选择了达尔文的厂区。这给我们带来的技术挑战,包括从Ichthys项目现场的900公里海底管线飞往达尔文的浮式生产设施规模最大的一个等等,以及一些社会和政治问题的另一种提升。此外INPEX已管理的所有这些挑战,成本不断上升和关闭LNG销售窗口牢牢记住。随着共享与世界的日本价值观的使命,INPEX有幸吸引了很多有才华的人都在澳大利亚和世界各地建立珀斯为重心的Ichthys项目工程。基于所有利益相关者之间的相互信任和利益,INPEX现在已经作好充分准备,以在预算范围内按时从而确保买家在一个碳约束的未来液化天然气的稳定供应几十年来come.This纸提供一个安全可靠的项目概述路径的Ichthys项目工程进度。这到底是怎么介绍的是基于项目的状态为2012年12月的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号