首页> 外文会议>Annual Conference of Metallurgists >(9550) IMPLEMENTATION OF AN ADVANCED THICKENER UNDERFLOW DENSITY CONTROL AT LOULO GOLD MINE, MALI
【24h】

(9550) IMPLEMENTATION OF AN ADVANCED THICKENER UNDERFLOW DENSITY CONTROL AT LOULO GOLD MINE, MALI

机译:(9550)马里Loulo金矿的先进增稠剂下流密度控制

获取原文

摘要

A model based control strategy was implemented at Loulo Gold Mine in Mali, to stabilise the thickener underflow stream density. This stream acts as the feed to the leaching circuit. pH control of the leaching circuit was integrated with the model-based controller due to slow process dynamics that are not suited to PID control. The controller performance was quantified over a period of 6 months, and was compared to the performance before implementation. The model based controller reduced process variability for both thickener underflow density and pH considerably, and resulted in a reduction in flocculant and lime consumption of 9.32 and 6.55%, respectively.
机译:基于模型的控制策略在马里的Loulo金矿实施,以稳定增稠剂下流流密度。该物流用作浸出电路的进料。由于不适合PID控制的过程动态慢,将浸出电路的pH控制与基于模型的控制器集成在一起。控制器性能在6个月的时间内量化,并与实施前的性能进行了比较。基于模型的控制器可显着降低加厚器下流密度和pH的过程可变性,并导致絮凝剂和石灰消耗量分别为9.32和6.55%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号