The City of Hialeah ("City") began its Reverse Osmosis Treatment Plant (Plant) Project pursuant to a joint participation agreement between the City and the County of Miami-Dade, Fla., (County), dated December 27, 2007. The project, which draws source water from the Upper Floridan Aquifer - a deep, brackish, groundwater alternative to the Biscayne Aquifer, was mandated by the South Florida Water Management District through the County's public water supply permit (Water Use Permit). The Water Use Permit requires the development of the project as an alternative to further withdrawals from the Biscayne Aquifer, which currently serves the potable water needs of the City and the County, as well as Broward County, Fla., and the southeastern portion of Palm Beach County, Fla. Although the project will have an initial installed production capacity of 10 million gallons per day (MGD), the project facilities shall be sized to accommodate future expansions up to 17.5 MGD. The water from the Plant will be conveyed to various points of interconnection with the City and the County. During the request for proposals process, the City opted to have each of the shortlisted vendors perform pilot testing and use those test results in demonstration of their proposal and their full-scale designs.
机译:HIALEAH(“城市”)根据迈阿密德德,佛罗里达州县的联合参与协议,开始渗透处理厂(工厂)项目。(县),2007年12月27日。该从佛罗里达州上上部冒险水含水层绘制源水的项目 - 南佛罗里达水管理区通过该县的公共供水许可证(用水许可证)授权,深入,咸水,地下水替代品。用水许可证要求该项目的发展作为进一步从Biscayne Aquifer进一步提取的替代方案,该含水层目前为城市和县域提供饮用水需求,以及棕榈县的武士县和棕榈菜的东南部海滩县,佛罗里达州。虽然该项目将拥有每天1000万加仑的初始安装产能(MGD),但项目设施应大小,以适应未来的扩张,高达17.5 MGD。来自该工厂的水将被传送到与城市和县域的各种互连点。在提案过程的请求期间,该市选择每个入围供应商执行试点测试,并使用这些测试结果在其提案及其全面设计的示范中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号