【24h】

Power Flow Analysis with Loads Profiles

机译:带负载配置文件的功率流量分析

获取原文

摘要

In this paper will be determined the power losses for the steady-state condition of the system and for the whole day, the buses voltages, the active power supplied by the generators and the active power used by the loads for a test system for a whole day, considering the loads profiles. The test system comprises three generators and two loads. The buses voltages, active power supplied by the generators, active power used by the loads and the power losses will be determined with the Neplan software, using the Newton-Raphson extended method. The loads daily power demand will be defined using the Neplan facilities.
机译:在本文中,将确定系统的稳态状态和整天的功率损耗,总线电压,由发电机提供的有源电量和整个负载用于测试系统的负载所使用的有源功率一天,考虑负载轮廓。测试系统包括三个发电机和两个负载。使用Newton-Raphson扩展方法,通过Newton-Raphson扩展方法使用Nepton软件来确定由发电机提供的通行电压,负载和电源损耗的电源电压。负载日常电源需求将使用Neplan设施定义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号