首页> 外文会议>International Conference on Applied Human Factors and Ergonomics >Using augmented ε-constraint method for solving a multi-objective operating theater scheduling
【24h】

Using augmented ε-constraint method for solving a multi-objective operating theater scheduling

机译:使用增强ε-约束方法来解决多目标操作剧院调度

获取原文

摘要

Operating Theaters are among the most critical parts in hospitals. Generally, an Operating Theater consists of three stages: Public Health Unit (PHU), Operating Rooms, and Post-Anesthesia Care Unit (PACU). Operating Theater significantly affects annual costs and revenues of a hospital due to requiring skillful staff and expensive equipment to operate surgeries beside high service fees. In this paper, proposing an operating theater daily schedule to serve surgical demands is considered as a three-stage flow-shop scheduling problem. The problem is formulated as a multi-objective mixed integer programming model aiming to balance workload of operating rooms and surgeons, minimize waiting times and maximize human (surgeons) reliability. Weighted-sum method and an augmented ε-constraint method are applied to solve two test problems. Analysis of obtained solutions verifies that both solution approaches are capable of providing appropriate schedules in a reasonable time.
机译:操作剧院是医院最关键的部分。通常,操作剧院由三个阶段组成:公共卫生单位(PHU),手术室和麻醉后护理单位(PACU)。由于需要熟练的员工和昂贵的设备,在高服务费用旁边运营手术,操作剧院显着影响一家医院的年费和收入。在本文中,提出运营剧院日本时间表以提供手术需求被认为是三级流量铺的调度问题。该问题被制定为一个多目标混合整数编程模型,旨在平衡操作室和外科医生的工作量,最大限度地减少等待时间并最大限度地提高人工(外科医生)可靠性。应用加权方法和增强ε-约束方法来解决两个测试问题。对获得的解决方案的分析验证了两种解决方案方法都能够在合理的时间内提供适当的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号