首页> 外文会议>International conference on railways as a system >Capacity achievement on Thameslink 2000
【24h】

Capacity achievement on Thameslink 2000

机译:2000年泰晤士河阵线的能力成就

获取原文

摘要

The paper describes the operational targets which Thameslink 2000 must achieve if Railtrack is to obtain its planned financial return from the implementation of the project. The targets are primarily expressed in terms of the available train paths per peak hour which Railtrack must provide. The factors which affect the achievement of this performance and the means by which they can be optimised are discussed. Finally the paper analyses the impacts of train types and load factors on passengerthroughput.
机译:本文介绍了如果railtrack是从项目实施中获取计划的财务返回,那么泰格拉内链接2000必须实现的操作目标。目标主要以每峰值小时的可用列车路径表示,该轨道必须提供。讨论了影响这种性能的因素和可以优化它们的方法。最后,该论文分析了火车类型和负载因子对分支机的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号