【24h】

Capacity achievement on Thameslink 2000

机译:Thameslink 2000的产能实现

获取原文
获取原文并翻译 | 示例

摘要

The paper describes the operational targets which Thameslink 2000 must achieve if Railtrack is to obtain its planned financial return from the implementation of the project. The targets are primarily expressed in terms of the available train paths per peak hour which Railtrack must provide. The factors which affect the achievement of this performance and the means by which they can be optimised are discussed. Finally the paper analyses the impacts of train types and load factors on passenger throughput.
机译:本文描述了Thameslink 2000如果Railtrack要从项目的实施中获得计划的财务回报,必须达到的运营目标。目标主要通过Railtrack必须提供的每个高峰时段的可用火车路径来表示。讨论了影响该性能实现的因素以及可以优化它们的方式。最后,本文分析了火车类型和载客率对旅客吞吐量的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号