首页> 外文会议>AWRA specialty conference on ground water/surface water interactions >ST. JOHNS RIVER WATER MANAGEMENT DISTRICT INTEGRATED WATER SUPPLY PLANNING TOOLS AND UNCERTAINTIES
【24h】

ST. JOHNS RIVER WATER MANAGEMENT DISTRICT INTEGRATED WATER SUPPLY PLANNING TOOLS AND UNCERTAINTIES

机译:英石。约翰河水管理区综合供水规划工具和不确定性

获取原文

摘要

St. Johns River Water Management District (SJRWMD) is committed to a continuing water supply planning process intended to identify water supply options capable of meeting projected needs, while protecting water resources and associated environmental systems. The first districtwide water supply plan was completed in April 2000. This plan, developed for a 20 year planning horizon, will be updated every 5 years. Water supply sources considered include fresh groundwater, brackish groundwater and surface water. Several analytical tools were developed to aid in the water supply planning process. These include, groundwater flow models, surface water yield analysis, water supply development cost models, groundwater withdrawal optimization models and economic optimization models. This paper describes the SJRWMD water supply planning process, the planning tools, planning process uncertainties and actions currently being taken to reduce uncertainty and to improve the integrated water supply planning process.
机译:圣约翰河水管理区(SJRWMD)致力于旨在识别能够满足预计需求的供水选项,同时保护水资源和相关环境系统的持续供水计划。第一个区供水计划于2000年4月完成。该计划为期20年的规划地平线,将每5年更新一次。被认为的供水源包括新鲜地下水,咸水地下水和地表水。开发了几种分析工具,以帮助供水计划过程。这些包括地下水流量模型,地表水产分析,供水开发成本模型,地下水撤离优化模型和经济优化模型。本文介绍了SJRWMD供水规划过程,计划工具,规划流程目前正在采取的行动,以减少不确定性并改善综合供水计划流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号