首页> 外文会议>American Gas Association Operating Section Conference >September 2012 Mutual Aid Assistance to Perform Leak Survey of Entire Gas Transmission System(PPT)
【24h】

September 2012 Mutual Aid Assistance to Perform Leak Survey of Entire Gas Transmission System(PPT)

机译:2012年9月互助援助,对整个燃气传输系统进行泄漏调查(PPT)

获取原文

摘要

1. September 9, 2011 at 6:10pm Incident and Emergency Operations Center opened in San Francisco at PG&E Headquarters. 2. September 13, 2010: CPUC issued an order to PG&E to Leak Survey all of the Gas Transmission system by October 12, 2010. With priority given for HCA 3 and 4's. 3. September 16-17, 2010: PG&E Project Personnel were recruited for the project and impacted departments notified. 4. September 17-22, 2010: Human Resources Learning Academy and Project Team Developed the training; OQ and testing for all external resources. 5. September 22, 2010: Mutual Aid began to arrive; training commenced (12 per day) and logistics commenced, addressing both mutual aid and contractors.
机译:1. 2011年9月9日下午6:10在PG&E总部在旧金山开业的事件和紧急运营中心。 2010年9月13日:CPUC在2010年10月12日之前向PG&E泄露了PG&E的命令。优先考虑HCA 3和4的优先权。 3. 2010年9月16日至17日:PG&E项目人员被招募了该项目和受影响的部门通知。 2010年9月17日至22日:人力资源学习学院和项目团队开发了培训; OQ和所有外部资源的测试。 2010年9月22日:互助开始到达;培训开始(每天12个)和物流开始,解决互助和承包商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号