首页> 外文会议>Society of Petroleum Engineers Asia Pacific Oil Gas Conference and Exhibition >Coiled Tubing Conveyed Fracturing System Allows Longer Zones to be Isolated in a Single Trip Multiple Times
【24h】

Coiled Tubing Conveyed Fracturing System Allows Longer Zones to be Isolated in a Single Trip Multiple Times

机译:盘绕管道输送压裂系统允许多次在一次行程中隔离较长的区域

获取原文

摘要

Increased production and lower costs in shallow gas wells are closely linked to developing and refining new coiled-tubing drilling, completion, and production techniques. Innovations in coiled tubing have reduced the costs of drilling and completing these wells and increased their productivity and life cycles. Coiled-tubing fracturing is one such innovation. This has been used for some time now, predominantly in North American shallow gas wells. In these wells, the cost advantages associated with working over the well in a live condition while reducing job time are attractive.
机译:浅气井的产量增加和降低成本与开发和精炼新的盘管钻井,完成和生产技术密切相关。盘绕管道的创新降低了钻井和完成这些井的成本,提高了他们的生产力和生命周期。卷绕管压裂是一种这种创新。这已经使用了一段时间,主要是在北美浅气井中。在这些井中,在降低工作时间的情况下,与现场状况良好地在井中工作的成本优势是有吸引力的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号