ArcelorMittal Tubarao Blast Furnace #1 First Campaign: Historical Results, Main Issues on Its Reline, Technological Updates, First Results of Second Campaign and Perspectives

机译:ArcelorMittal Tubarao Breat Furnace#1第一竞选:历史成果,其Reline的主要问题,技术更新,第二次竞选和观点的第一个结果

获取原文

摘要

ArcelorMittal Tubarao former CST was established in 1976 as a State controlled joint-venture, with minority ownership of the Kawasaki group, from Japan and the Ilva group (former Finsider), from Italy. However, only in November, 1983 the Blast Furnace #1 began the first campaign. Due to integrated efforts of maintenance, operation and engineering teams, Blast Furnace #1 reached the relevant mark of 28,4 years of uninterrupted operation with an expressive mark of about 94 million tons of hot metal in a unique campaign, which is considered world benchmark in hot metal production, with a high operational performance, high productivity and low fuel consumption.
机译:Arcelormittal Tubarao前CST是在1976年成立于1976年,作为国家受控的合资企业,来自日本和ILVA​​集团(前芬兰)的少数群体所有权,来自意大利。但是,只有1983年11月,高炉#1开始了第一个竞选活动。由于维护,运营和工程团队的综合努力,高炉#1达到了28,4多年不间断运作的相关标志,在一个独特的竞选中的热门金属约为9400万吨的热门金属,这被认为是世界基准在热金属生产中,具有较高的操作性能,生产力高,燃料消耗低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号