Blast Furnace Campaign Extension at JSW BF#3

机译:JSW BF#3的高炉竞选延期

获取原文

摘要

The reliable and stable operation of a blast furnace allows for a longer campaign life therefore increasing the total utilization of the furnace for production of hot metal. Careful monitoring of refractory wear and the implementation of proactive mitigating measures can allow for blast furnaces to confidently push past originally scheduled reline dates. JSW and Hatch implanted a systematic approach utilizing acousto ultrasonic-echo (AU-E) to monitor the condition of the BF#3 refractory lining at the Vijayanagar Works site owned by JSW. Testing revealed problematic areas within the furnace refractory lining, the development of the elephant foot phenomenon, refractory wear rates, extent of the accretion layer, and the location of cracks and anomalies. A mitigation plan was developed that included the improvement in coke quality, periodical washing of staves, the addition of titania, and increased grouting in specific areas. The periodic measurements indicated that the proactive mitigations taken had been very effective and so the reline date of the BF#3 was deferred to increase total furnace utilization.
机译:高炉的可靠稳定运行允许更长的竞选寿命,因此增加炉子的总利用率以生产热金属。仔细监测耐火磨损和主动减轻措施的实施可以允许高炉自信地推动最初的预定Reline日期。 JSW和舱口植入了利用Acousto Ultrasonic-echo(AU-E)的系统方法,以监测JSW所拥有的Vijayanagar Works网站的BF#3耐火衬里的状况。测试揭示了炉内耐火衬里内的有问题的区域,大象脚现象的发展,耐火磨损率,凸起层的程度,以及裂缝和异常的位置。开发了一种缓解计划,包括改善焦炭质量,定期洗涤汽笛,加入巨头,以及在特定区域的灌浆增加。定期测量表明,所采取的积极效率非常有效,因此推迟了BF#3的Reline日期以增加总炉使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号