High Rate Coal Injection on a Large Blast Furnace

机译:大型高炉上的高速煤注射

获取原文

摘要

In July 2013 the first coal was injected into the Redcar SSI Blast Furnace from the new pulverized coal injection plant designed and commissioned by Siemens Metals Technologies. The plant, designed to deliver 120 kilograms per hour of pulverized coal, which equates to around 235 kilogram per tonne of hot metal produced. The plant consists of an injection system supplying 36 tuyeres, a coal drying system and a raw coal handling facility. The single stream grinding and drying system utilizes one of the largest grinding mills in operation in the world for a blast furnace application. Redcar Blast Furnace has been operating under the ownership of SSI since its restart in April 2012, following shut down in February 2010 under its previous owners. The furnace is one of the largest in the world with a hearth diameter of 14 meters. Since the introduction of coal injection the furnace has achieved production rates in excess of 9500 tonnes per day.
机译:2013年7月,从西门子金属技术设计和委托的新型粉煤液注射厂注入了第一煤层进入红锥SSI高炉。该植物,旨在提供每小时120公斤粉煤,这相当于每吨制造的热金属约235千克。该植物包括注射系统,供应36间簇,煤炭干燥系统和原煤处理设施。单流磨削和干燥系统利用世界上最大的研磨机之一进行高炉应用。自2012年4月重新启动以来,Redcar Blast Furnace一直在SSI的所有权下运作,这是在2010年2月在其之前的所有者下关闭。炉子是世界上最大的炉膛之一,炉膛直径为14米。由于煤注射引入,炉子已经实现了每天超过9500吨的生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号