首页> 外文会议>International Topical Meeting on Nuclear Plant Instrumentation, Controls, and Human Machine Interface Technology >Insights from a Benchmark Integrated System Validation of a Modernized NPP Control Room: Performance Measurement and the Comparison to the Benchmark System
【24h】

Insights from a Benchmark Integrated System Validation of a Modernized NPP Control Room: Performance Measurement and the Comparison to the Benchmark System

机译:从现代化的NPP控制室的基准集成系统验证的基准集成系统验证的见解:性能测量和与基准系统的比较

获取原文

摘要

The technical basis for performing Integrated System Validation (ISV) of new or modernized NPP control rooms needs further development. Most of the basis for conducting benchmark testing can be found in the review guideline NUREG/CR-6393. The experiences from a benchmark ISV of a modernized control room led to the identification of several unsolved practical and methodological issues. This paper discusses two such issues, i.e. the construction of usable performance measurement batteries, and how one should identify noteworthy performance differences between the modernized system and the benchmark system.
机译:执行新的或现代化NPP控制室的综合系统验证(ISV)的技术基础需要进一步发展。大部分进行基准测试的基础都可以在审查指南Nureg / CR-6393中找到。现代化控制室基准ISV的经验导致了几种未解决的实际和方法问题的识别。本文讨论了两个这样的问题,即施工可用性测量电池,以及如何确定现代化系统与基准系统之间值得注意的性能差异。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号