首页> 外文会议>COAL-GEN >Coal-Fired Boilers: Lessons Learned from Challenges to PSD Permits
【24h】

Coal-Fired Boilers: Lessons Learned from Challenges to PSD Permits

机译:燃煤锅炉:从挑战到PSD许可证的经验教训

获取原文

摘要

Almost every recent submitted application for a new coal-fired power plant has been challenged during the Prevention of Significant Deterioration (PSD) permitting process. Environmentalists and other citizen groups have targeted coal combustion for environmental protests. Navigating these challenges is crucial to the development and design of a new power plant because: Challengers' comments can change which control devices and permit limits will be required by the state in order to issue a construction permit; Design changes to air pollution control equipment can change the financial cost/benefits of the project; Resolving permit challenges can delay projects a year or more while the challenges are resolved. Recently issued PSD permits for which these challenges have been successfully resolved will be reviewed with the goal of providing a roadmap to projects just entering the permitting process.
机译:在预防显着恶化(PSD)允许过程中,几乎每次最近提交的新的燃煤电厂的申请都受到挑战。环保主义者和其他公民团队对环境抗议有针对性的煤炭燃烧。导航这些挑战对新电厂的开发和设计至关重要,因为:挑战者的评论可以改变国家要求哪些控制设备和许可限制,以便发布建筑许可;对空气污染控制设备的设计变更可以改变项目的财务成本/福利;解决许可证挑战可以延迟一年或更长时间的项目,而挑战则得到解决。最近发布的PSD许可证,这些挑战已经成功解决,其目标是为进入允许流程的项目提供路线图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号