首页> 外文会议>International Copper-Cobre Conference >REFRACTORY PERFORMANCE AND CAMPAIGN LIFE EXTENSION OF THE REVERBERATORY FURNACE AT HBMS IN FLIN FLON
【24h】

REFRACTORY PERFORMANCE AND CAMPAIGN LIFE EXTENSION OF THE REVERBERATORY FURNACE AT HBMS IN FLIN FLON

机译:Evin Flon中HBMS混响炉的耐火性能和竞选寿命延伸

获取原文

摘要

The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick quality improvements. In recent decades the campaign life had been extended such that a complete rebuild was scheduled every 3 years. The latest furnace rebuild and start up has been after a campaign life of nearly 6 years. Brick construction methods and techniques along with furnace operational practices allow the present campaign to be double that of the historical campaign length.
机译:Flin Flon的HBMS混响炉最初在20世纪20年代后期设计。在整个几十年中,由于业务惯例,技术变化和砖质量改进,竞选生活已经增加。近几十年来,竞选生活延长,使得完全重建每3年安排。最新的炉子重建并启动已在近6年的竞选活动之后。砖施工方法和技术以及炉子运营实践允许目前的运动是历史竞选长度的两倍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号