首页> 外文会议>International Copper-Cobre Conference >DAILY PRODUCTION PLANNING EFFORTS AT PHELPS DODGE MIAMI SMELTER
【24h】

DAILY PRODUCTION PLANNING EFFORTS AT PHELPS DODGE MIAMI SMELTER

机译:菲尔普斯道奇迈阿密冶炼厂的日常生产计划努力

获取原文

摘要

Daily production scheduling in a highly dynamic smelter environment has always been a great challenge for the operation management due to a significant amount of uncertainties. Planned and unexpected equipment failures, various energy outages, inaccuracies in flow and mass balancing, manpower availability conflicts and other constraints make the job of daily production planning exceptionally difficult. This paper discusses a general scheduling approach utilized by the production management of the Phelps Dodge Miami Smelter (the Smelter). It also describes logical assumptions and some practical software solutions that have been exploited by the Smelter managers to assist the front line supervisors in dealing with daily planning activities for several years.
机译:由于大量的不确定性,在高度动态的冶炼环境中,在高度动态的冶炼环境中的日常生产计划一直是运营管理的巨大挑战。计划和意外的设备故障,各种能源中断,流量和质量平衡的不准确,人力可用性冲突和其他限制使得日常生产计划的工作特别困难。本文讨论了菲尔普斯推迟迈阿密冶炼厂(冶炼厂)的生产管理使用的一般调度方法。它还描述了福利管理人员已被利用的逻辑假设和一些实用的软件解决方案,以协助前线监督员处理几年的日常规划活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号