首页> 外文会议>IIE Annual Conference and Expo >Estimating Product Development Time using Extended PERT Model
【24h】

Estimating Product Development Time using Extended PERT Model

机译:使用扩展Pert模型估算产品开发时间

获取原文

摘要

Product Development (PD) is becoming significant to business demands for new product. PD is a complex and dynamic process that cannot be managed along a single dimension. This paper illustrates that traditional Project Management (PM) approaches are limited for a robust PD application. It necessitates a modified PM model to deal with intricacies of PD process. This paper describes a modified PERT model application to manage the on-time delivery associated with the PD process. The advantage of this model is its ability to meet delivery in the uncertain environment by either reducing the variance in the current process or improving the efficiency of the current process.
机译:产品开发(PD)对新产品的业务需求变得重要意义。 PD是一种复杂的和动态过程,不能沿着单个维度管理。本文说明了传统的项目管理(PM)方法受到强大的PD应用程序的限制。它需要修改的PM模型来处理PD过程的复杂性。本文介绍了一个修改的Pert模型应用程序,用于管理与PD进程相关联的随时传送。该模型的优点是其能够通过降低当前过程的方差或提高当前过程的效率来满足不确定环境中的交付能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号