首页> 外文会议>IEEE Bucharest PowerTech >Functional requirements for Southwest Power Pool Energy Imbalance market dispatch
【24h】

Functional requirements for Southwest Power Pool Energy Imbalance market dispatch

机译:西南电力池能源不平衡市场调度的功能要求

获取原文

摘要

This paper discusses high-level functional requirements of the Energy Imbalance Service (EIS) market for the Southwest Power Pool (SPP) Regional Transmission Organization (RTO), in the USA. SPP has taken a controlled and step-by-step approach towards a full market model. Therefore, SPP has tried to introduce the EIS market on top of the traditional Market Participant (MP) activities with minimal impact. Currently in SPP, the EIS market is providing a central pool dispatch of energy imbalance in the Real-Time (RT) operations without Day-Ahead (DA) energy or Ancillary Services (AS) markets. Offering resources into the market is voluntary. This model of the light-weight electricity market is quite different than other major markets in the US, especially those in the northeast. The focus of this paper is on the dispatch model in the EIS market with emphasis on different constraint types. The EIS market dispatch is based on the nodal pricing like other major US electricity markets.
机译:本文讨论了美国西南电力池(SPP)区域传输组织(RTO)的能源不平衡服务(EIS)市场的高级功能要求。 SPP已经迈出了一个完整的市场模型的控制和逐步的方法。因此,SPP试图在传统市场参与者(MP)活动之上推出EIS市场,影响最小。目前在SPP中,EIS市场在实时(RT)操作中提供了一项能源不平衡的中央池调度,恕不另行的能量或辅助服务(AS)市场。向市场提供资源是自愿的。这种轻量级电力市场的模型与美国的其他主要市场不同,特别是东北部的其他主要市场。本文的重点是EIS市场的调度模式,重点是不同的约束类型。 EIS市场派遣是基于像其他主要的美国电力市场的节点定价。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号