首页> 外文会议>International Mine Water Conference >MINE WATER MANAGEMENT OF FLOODED COAL MINES IN THE SYDNEY COAL FIELD, NOVA SCOTIA, CANADA
【24h】

MINE WATER MANAGEMENT OF FLOODED COAL MINES IN THE SYDNEY COAL FIELD, NOVA SCOTIA, CANADA

机译:加拿大新斯科舍省悉尼煤田洪水煤矿的矿井水管理

获取原文

摘要

Coal was first mined in Cape Breton, Nova Scotia, Canada in 1685, by the French military authorities, from the exposed coal seam outcrops. By 2001 the last remaining underground coal mine in the Sydney Coalfield had ceased operation and so began the legacy of mine water in Cape Breton. More than fifty underground coal mines have worked the three major coal seams in the Sydney Coalfield, producing an estimated 500 million tons of coal and waste rock, thus leaving enough void space for more than 50 billion gallons of ARD producing mine water. At present there are several large groups of interconnected and abandoned coal mines or "hydraulic systems" within the Sydney Coalfield that are flooded to equilibrium, and there are several other hydraulic systems that are in the process of flooding. One such group of ten interconnected mines that is partially flooded is referred to locally as the IB Hydraulic System. This paper addresses the mine water management techniques that were developed to prevent a discharge of deleterious mine water to the environment from the IB Hydraulic System and outlines the plans for the future.
机译:煤炭首次于1985年由法国军事当局于1685年在加拿大新斯科舍省开采,由法国军事当局从暴露的煤层露头开始。到2001年,悉尼煤田的最后剩余地下煤矿已经停止运营,因此开始在布列顿山水中的矿井遗产。超过五十个地下煤矿在悉尼煤田的三个主要煤层工作,生产了估计的500万吨煤炭和废物岩石,从而留下足够的空隙空间超过500亿加仑的煤层水。目前,悉尼煤田内有几组互联和废弃的煤矿或“液压系统”,被淹没到均衡,并且有几种正在洪水过程中的其他液压系统。作为IB液压系统,部分淹没的10个十个互连的矿物的一组被局部被称为IB液压系统。本文解决了开发的矿山水管理技术,以防止从IB液压系统排放有害矿井水,并概述了未来的计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号