首页> 外文会议>American Society For Engineering Education Annual Conference and Exposition >SCHOLARSHIP OF ENGAGEMENT AND PROJECT BASED LEARNING: EXPERIENTIAL BASED LEARNING PROJECT FOR CONSTRUCTION MANAGEMENT STUDENTS AT WESTERN CAROLINA UNIVERSITY
【24h】

SCHOLARSHIP OF ENGAGEMENT AND PROJECT BASED LEARNING: EXPERIENTIAL BASED LEARNING PROJECT FOR CONSTRUCTION MANAGEMENT STUDENTS AT WESTERN CAROLINA UNIVERSITY

机译:参与奖学金和基于项目的学习:西卡罗来纳大学施工管理学生体验基于学习项目

获取原文

摘要

The Peggy Crosby Center located in Highlands, North Carolina is a multi-use complex that was built in the late 1800's. Originally built as a private dwelling and after many years it was donated to the village of Highlands. The structure received renovations and additions over the years when it became the regional hospital for the area. Upon the recent completion of the new regional hospital the Peggy Crosby Center became a not for profit establishment for the community. It currently houses a computer training center, day care center, used bookstore, Red Cross offices, and a catering business, along with other use groups. During the fall of 2008, members of the Peggy Crosby Board of Directors approached the faculty of the Construction Management program to assist them with needed updates and renovations for their building. The faculty provided plans, estimates and recommendations for a various number of issues. This paper discusses the results of the consultations by Western Carolina University faculty members for the Peggy Crosby Center and student work. Areas of Concern and Question: What is currently in place for energy efficiency and is it adequate? What can be done internally to make the building more energy efficient? What assessment can be made about the current heating system? What alternative energy sources can be applied to the structure as upgrades? Would the alternative sources be beneficial over time? What building components need to be updated and replaced? What renovations can be done to expand the use within the existing building footprint? What costs would be incurred? How long will renovations and upgrades take?
机译:北卡罗来纳州北卡罗来纳州的高地的Peggy克罗斯比中心是一家建于1800年代后期的多用途综合体。最初是作为私人住宅,经过多年的私人住宅,捐赠给高地村庄。该结构在多年来,当它成为该地区的区域医院时,该结构得到了改造和补充。最近完成新区域医院后,PEGGY CROSBE CENTER成为一个不适合社区的利润建立。它目前拥有一台电脑培训中心,日托中心,二手书店,红十字会和餐饮业,以及其他使用群体。在2008年秋季,PEGGY CROSBY董事会成员致力于建设管理方案的能力,以协助他们的建筑物所需的更新和装修。该教师为各种问题提供了计划,估计和建议。本文讨论了Carolina大学教师为Peggy Crokbe Center和学生工作的磋商结果。关注领域和问题:目前是什么能源效率,它足够?什么可以在内部完成,使建筑更节能?关于当前的加热系统可以进行哪些评估?什么替代的能源可以应用于结构升级?替代来源随着时间的推移是否有益?需要更新和更换的构建组件?可以进行哪些装修以扩展现有建筑占用件内的使用?会产生什么费用?翻新和升级需要多长时间?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号