首页> 外文会议>International Conference on Advanced Design and Manufacturing Engineering >Discussions on the Construction Technology of the Vibrating Inserting Rod Long Auger Bored Pile -CFA
【24h】

Discussions on the Construction Technology of the Vibrating Inserting Rod Long Auger Bored Pile -CFA

机译:关于振动插入杆长螺旋钻孔钻孔桩施工技术的探讨-CFA

获取原文

摘要

The vibrating inserting rod Long Auger Bored pile is a new technology of pressure grouting pile based on the development in the long spiral drilling. On the basis of introducing the method of traditional slurry drilled pile, this paper analyzes advantages of the vibrating inserting rod Long Auger Bored pile, the construction process and key points in detail, summarizes the causes of common quality defects of the vibrating inserting rod Long Auger Bored cast-with-pressure and their solutions.
机译:振动插入杆长螺旋钻孔钻孔是一种基于长螺旋钻孔发展的压力灌浆桩的新技术。在引入传统浆料钻桩的方法的基础上,本文分析了振动插入杆长螺旋钻孔绒毛,施工过程和关键点的优点,总结了振动插入杆长螺旋钻的常见质量缺陷的原因无聊的铸造 - 压力和它们的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号