首页> 外文会议>International Conference on Civil Engineering and Transportation >Experimental Research on Headwork Spillway Dam of Ecuador Coca Codo Sinclair Hydropower Station
【24h】

Experimental Research on Headwork Spillway Dam of Ecuador Coca Codo Sinclair Hydropower Station

机译:厄瓜多尔柯卡芯片水电站老板溢洪道大坝实验研究

获取原文

摘要

The discharge capacity, pressure and downstream dissipation for scour prevention under fluctuating pressure of the power station headwork spillway dam were measured and analyzed through model test. The research showed that the discharge capacity of the spillway dam met the design requirement, the designed body type of the spillway dam met the requirement of standards. The modified spillway basin body type and the downstream protection type could meet the requirement of dissipation for scour prevention. In the experiment, the mean square root, spectral characteristics and amplitude sampling of the spillway dam flow fluctuating pressure were measured and analyzed. The maximum fluctuating pressure mean root was about 4.31m water column, the dominant frequencies of flow fluctuating pressure at all measuring points ranged from 0.01 to 2Hz (prototype), and the random process of the flow fluctuating pressure conformed to probability normal distribution (Gaussian distribution) on the whole.
机译:通过模型试验测量并通过模型试验测量了在电站工作台溢洪道大坝的波动压力下防止防擦除防空的放电容量,压力和下游耗散。该研究表明,溢洪道大坝的放电容量符合设计要求,设计的身体类型的溢洪道大坝符合标准的要求。改进的溢洪道盆体型和下游保护型可以满足耗散防止防污的要求。在实验中,测量并分析了溢洪道坝流量波动压力的平均平方根,光谱特性和幅度采样。最大波动压力平均根为约4.31M水柱,所有测量点的流动波动压力的主导频率范围为0.01至2Hz(原型),以及流动波动压力的随机过程符合概率正态分布(高斯分布) 总体上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号