首页> 外文会议>Society of Petroleum Engineers Nigeria Annual International Conference and Exhibition >Field Development and Optimization Strategy of a Giant Gas Reservoirin the Gbaran-Ubie Node
【24h】

Field Development and Optimization Strategy of a Giant Gas Reservoirin the Gbaran-Ubie Node

机译:GBaran-Ubie节点巨型气体储层的现场开发与优化策略

获取原文

摘要

The XON field is one of the five fields in the Gbaran-Ubienode to supply gas to Nigeria Liquified Natural Gas and isa field case history to illustrate the techniques and benefitsof field development optimization right from initial fieldoptimization to well delivery.The XON AB4000X reservoir is one of the largest NonAssociated Gas reservoir in SPDC and is expected toprovide more than half the gas required for GbaranCentral Processing Facility capacity of 1Bscf.Gas reserves from the 2003 Field review went down from1.6 Tcf to 1.25 Tcf post the drilling of XON 7 and forecastbased on new volumes indicate that the planned totalreservoir offtake of 500 MMScf/d (100 MMScf/d per 5 gasproducer planned for the reservoir) will only be sustainedfor 3 years instead of 5+ years. Following this, it becamenecessary to accurately estimate the Gas Initially InPlace(GIIP) , Ultimate Recovery (UR) and also providean optimum development plan for this reservoir based onthe new available data.An optimisation optimization team was put in place tobuild new static and dynamic models based on newavailable data to be used for:1. Accurately estimate in place volumes and UR2. Optimise expected reserves the ReservoirDevelopment Plan3. Support drilling campaignThe optimization optimization results have led to increasein expectation GIIP to 2.03 Tcf, represent a 22% increaseover the 2003 Field Review and a 63% over the 2005estimate.The CIIP increased to 106.0 MMstb, representinga 23% over the 2003 FR estimate.Total gas recovery hasalso increase to 1.26 Tcf which is about 20% from 2003Field Review (FR). Production rates increased from 100 to150 MMScfand compression scope of about 500 Bscf to further addvalue to the filed development.Most of the wells were delivered as top quartile wells dueto collaboration between the asset, project and wellengineering teams.
机译:XON Field是GBaran-Ubienode中的五个字段之一,用于向尼日利亚液化天然气和ISA现场案例历史提供气体,以说明从初始FieldOptimization到良好交付的现场开发优化的技术和优势。XON AB4000X水库是一个在SPDC中最大的非分配气体储层,预计TOPROVIDE超过2003年野外审查的GBARANCENT储量GBBARANCENT储量所需的一半以上的气体从1.6 TCF到1.25 TCF发布XON 7和ENCEPASTBASED在新的卷上表明,计划的溢价级别投样500 mmsc / d(计划为储层计划100 mmscf / d)只会缓和3年而不是5年。遵循这一点,它必须准确地估计气体最初(Giip),最终恢复(UR),并且还基于新的可用数据的该储层的普及优化开发计划.AN优化优化团队进行了建立了新的静态和动态模型基于要使用的新可用数据:1。准确估计到位卷和UR2。优化预期保留储存计划3。支持钻探活动优化优化结果导致预期Giip增加到2.03吨,代表2003年的野外审查22%,比2005年审查的63%。CIIP增加到2003年FR估算值.Total增加到106.0 MMSTB。气体回收HASASO增加到1.26 TCF,2003年菲尔德审查(FR)约为20%。生产率从100到150 mmscfand压缩范围增加到大约500 bscf,以进一步的addvalue到提交的发展。大多数井被交付为资产,项目和合适球队之间的顶部四分位数杜替号井杜替索合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号