首页> 外文会议>International Conference on Materials and Products Manufacturing Technology >The Improvement of Control System of Wind Turbine Gearbox Test Device
【24h】

The Improvement of Control System of Wind Turbine Gearbox Test Device

机译:风力涡轮机齿轮箱试验装置控制系统的改进

获取原文

摘要

Aim at technical improve of the control system in the Wind Turbine Gearbox Test Device at a factory of Yinchuan, the design plan of the control system Based on Mitsubishi FX series PLC, FX2n-4AD, FX2n-4DA, Mitsubishi FX series Ethernet adapters and King View are put forward, lower processor was composed by FX2N series CPU module and I/O module in that control system, moreover, centralized management and real-time monitoring of collect data are carried out through the upper processor that adopts industrial computer and King View. Through the improvement device become automation, enhance safety and capacity of product development of company.
机译:旨在技术改进的控制系统在银汽机齿轮箱试验装置在银川工厂,基于三菱FX系列PLC的控制系统设计计划,FX2N-4AD,FX2N-4DA,三菱FX系列以太网适配器和王提出了Publue,下处理器由FX2N系列CPU模块和I / O模块组成,在该控制系统中,通过采用工业计算机和特大视野的上处理器进行集中管理和收集数据的实时监控。通过改进装置成为自动化,提高公司产品开发的安全性和能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号