The Comparison and Selection of the Solutions for Liuyang River Tunnel's Inclined Shaft Entering to the Main Hole and the Key Points of Construction

机译:浏阳河隧道倾斜轴对井井倾斜轴的比较与选择及施工重点

获取原文

摘要

The construction geological condition is complex in the transition section from the inclined shaft to the main hole. There are two kinds of construction schemes. After the comparison of the advantages and disadvantages of the two different construction schemes, it has selected the construction scheme of the rectangular pilot tunnel vertical to the main hole. This paper solve the construction problem of the transition section from the inclined shaft to the main hole of large cross section tunnel of passenger dedicated line under complicated geological conditions. According to the previous research results, the method can be used to large-cross section tunnel. The scaffold design and auxiliary construction measures is detailed. Compared with the expected duration, it completed the transition construction ahead of time with the speed superior to the ones of other similar works, and forming a safe and efficient construction situation.
机译:施工地质条件在从倾斜轴到主孔的过渡部分复杂。有两种施工方案。在比较两种不同结构方案的优点和缺点之后,它选择了垂直于主孔的矩形导频隧道的施工方案。本文解决了复杂地质条件下乘客专用线大横截面隧道的倾斜轴的过渡部分的施工问题。根据先前的研究结果,该方法可用于大横截面隧道。脚手架设计和辅助施工措施详细说明。与预期的持续时间相比,它提前完成了过渡结构,速度优于其他类似作品,形成安全有效的施工局面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号