首页> 外文会议>International Conference on Electronic and Mechanical Engineering and Information Technology >A New Way to Determine Engineering Cost Price in the Construction Engineering Tendering
【24h】

A New Way to Determine Engineering Cost Price in the Construction Engineering Tendering

机译:一种确定工程招标工程成本价格的新方法

获取原文

摘要

The lowest bid method should be used in the bid evaluation of construction engineering, and it is a critical problem that how to calculate the lowest cost price of the bid proposal. In this paper, a new model is proposed, based on multiple attribute decision making theory. According to the tenderer's preference that indicates their feelings towards difference in strength of technology and management between the bidders, the deviation minimization and maximization decision method are adopted. We establish the optimized decision model. This model has been successfully applied in the formulation of bid proposal of construction engineering in Yantai.
机译:应在建筑工程的出价评估中使用最低出价方法,并且如何计算出价提案的最低成本价格的关键问题。本文基于多个属性决策理论,提出了一种新模型。根据投标人的偏好,表明他们对投标人之间的技术和管理实力差异的感情,采用了偏差最小化和最大化决策方法。我们建立了优化的决策模型。该模型已成功应用于烟台建筑工程的投标提案制定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号