首页> 外文会议>International Conference on Manufacture Engineering, Quality and Production System >Numerical Analysis on Concrete Filled Steel Tube Supports Support Technology of III-level south Roadway in Yangzhuang Mine
【24h】

Numerical Analysis on Concrete Filled Steel Tube Supports Support Technology of III-level south Roadway in Yangzhuang Mine

机译:混凝土填充钢管的数值分析支持扬子矿III级南路的支持技术

获取原文

摘要

Combined with engineering conditions of the Ⅲ-level south roadway of Yangzhuang Mine, the deformation of surrounding rock and mechanical characteristics of support structure is analyzed by FLAC3D numerical simulation when the roadway is supported by CFSTS support program. The results shows that: For the weak mudstone surrounding rock and complex geological conditions, the deformation of surrounding rock is fast, large and unsymmetrical deformation, the bolt-net-shotcrete support is difficult to maintain the roadway stability. The CFSTS used Φ219 ×8 mm steel tube filled with C50 core concrete, which provides powerful supporting force combined with other roadway support ways and restrict surrounding rock to the roadway space. By FLAC3D simulation analysis shows, the deformation of surrounding rock is small and support structure is mad good use and keep work, which can maintain the stability of roadway.
机译:结合扬庄矿Ⅲ级南路的工程条件,通过FLAC3D数值模拟分析围岩岩石和机械特性的变形,当CFSTS支持计划支持道路时,FLAC3D数值模拟分析。结果表明:对于疲弱的泥岩周围的岩石和复杂的地质条件,周围岩石的变形是快速,大而不对称的变形,螺栓 - 射击池难以保持道路稳定性。使用C50芯混凝土的Φ219×8mm钢管使用φ219×8 mm钢管,提供了强大的支撑力与其他巷道支持方式,并限制围岩到道路空间。通过FLAC3D仿真分析显示,周围岩石的变形是小而且支撑结构是疯狂的利用,保持工作,可以保持道路的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号