首页> 外文会议>International Conference on Rehabilitation and Maintenance in Civil Engineering >Application of AHP Method for Determining the Priority of Puskesmas Pembantu Building Maintenance Based on GIS in Sukoharjo District Central of Java
【24h】

Application of AHP Method for Determining the Priority of Puskesmas Pembantu Building Maintenance Based on GIS in Sukoharjo District Central of Java

机译:AHP方法在Java苏科哈厅区综合理解决地区施加帕苏马斯派古建设维护优先级的应用

获取原文

摘要

Puskesmas Pembantu (Pustu) building is one of infrastructures which should be maintained because it is the closest in serving people to get health care. So that the Pustu building is always in the maintained and provided optimum performance. This study was aimed to get the criteria in determining the building maintenance priorities based on the extent of damage and building components of Pustu. This program application was used Analytical Hierarchy Process (AHP) script to analysis each criterion in building component. Primary data obtained by the survey to give a score of damage for each building components and weighting in each building component. The secondary data was obtained from already exist sources (and data from previous studies) as well as the data source was obtained from the regulations of Republic of Indonesia government. The computer program was made to calculate the weight of building components, calculate Buiding Conditin Index (BCI), and displays the results. In addition the program can display the location on a map. Total pustu building in Sukoharjo is 45. The level of damage to the building indicated by BCI. Based on the level of the damage, there are 3 pustu which has the greatest value, that are Pustu Cemani (BCI: 67.9042), Pustu Puhgogor (BCI: 68.3214), and Pustu Cabeyan (BCI: 68.3214).
机译:Puskesmas Pembantu(Pustu)建筑是应保持的基础设施之一,因为它是服务人员获得医疗保健的最接近。因此,PUSTU建筑始终处于维护和提供最佳性能。本研究旨在基于Pustu的损坏和建筑组成部分确定建筑维护优先级的标准。该程序应用程序使用分析层次结构(AHP)脚本来分析构建组件中的每个标准。通过调查获得的主要数据,为每个建筑组件的每个建筑组件和加权提供损坏的分数。从已经存在的源(以及来自先前研究的数据)获得的二级数据以及数据源是从印度尼西亚共和国政府的规定获得的。计算机程序是计算构建组件的重量,计算构建化符号指数(BCI),并显示结果。此外,程序可以在地图上显示位置。 Sukoharjo的总Pustu建筑为45. BCI所示的建筑物的损坏程度。基于损坏的水平,有3个PUSTU具有最大的价值,即Pustu Cemani(BCI:67.9042),Pustu Puhgogor(BCI:68.3214)和Pustu Cabeyan(BCI:68.3214)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号